IT Cert Ready

(ISC)²

CISSP

Certified Information Systems Security Professional

Start practicing

About this certification

CISSP (Certified Information Systems Security Professional) is a (ISC)² certification. IT Cert Ready offers 1,677 practice questions with domain quizzes, full mock exams, and detailed explanations. Practice by official domain with 8 blueprint-aligned domains.

Official exam domain weights

Verified blueprint weights from the official exam outline.

  • Domain 1 · Security and Risk Management · 16%
  • Domain 2 · Asset Security · 10%
  • Domain 3 · Security Architecture and Engineering · 13%
  • Domain 4 · Communication and Network Security · 13%
  • Domain 5 · Identity and Access Management (IAM) · 13%
  • Domain 6 · Security Assessment and Testing · 12%
  • Domain 7 · Security Operations · 13%
  • Domain 8 · Software Development Security · 10%

Sample CISSP practice questions

Preview realistic multiple-choice items from the IT Cert Ready question bank. Expand each answer for the correct choice and explanation—the same format used in domain quizzes and mock exams.

  1. Sample question 1 · Software Development Security (10%)

    Meridian Assurance Group, a mid-sized regional insurance carrier, outsources policy administration software development to a third-party vendor, Crestline Technologies, under a multi-year contract. During a routine quarterly review, Meridian's security team discovers that Crestline's development environment lacks centralized audit logging for code commits, dependency updates, and build pipeline changes. A recent deployment introduced an undocumented library that was not present in the approved software bill of materials (SBOM). The CISO must determine the most appropriate immediate action to assess the effectiveness of software security controls given the supply chain risk this represents. As Meridian Assurance Group's CISO, which action should you prioritize FIRST to assess the effectiveness of software security controls and contain the supply chain risk introduced by the undocumented library?

    • A. Terminate the contract with Crestline Technologies and initiate an emergency procurement process for an alternative vendor.
    • B. Require Crestline to produce a complete, verified SBOM for the current production build and cross-reference it against the approved baseline to identify all unauthorized components before the next deployment window.
    • C. Notify the state insurance regulator of a potential supply chain compromise and request guidance on remediation timelines.
    • D. Instruct the internal development team to rewrite the affected modules in-house to eliminate dependency on Crestline's build artifacts.
    View answer & explanation

    Correct answer: B. Require Crestline to produce a complete, verified SBOM for the current production build and cross-reference it against the approved baseline to identify all unauthorized components before the next deployment window.

    [Domain 8 - Software Development Security, Task 8.3 - Assess the effectiveness of software security, Area 1 - Auditing and logging of changes] Core Concept: Assess the effectiveness of software security requires applying auditing and logging of changes in the context of the scenario, consistent with the official (ISC)² CISSP exam outline. Correct Answer (B): Require Crestline to produce a complete, verified SBOM for the current production build and cross-reference it against the approved baseline to identify all unauthorized components before the next deployment window. Why the other options are incorrect: Option A: Immediate contract termination is a disproportionate and operationally disruptive response before the scope and severity of the risk have been assessed; it also eliminates the vendor's cooperation needed for investigation. Option C: Regulatory notification may ultimately be required, but it is premature before internal assessment has determined whether a reportable incident has actually occurred; notifying regulators without facts can trigger unnecessary scrutiny. Option D: Rewriting modules in-house is a long-term remediation strategy, not an immediate assessment action, and does not address the need to understand what unauthorized components are currently in production.

  2. Sample question 2 · Software Development Security (10%)

    Meridian Broadcast Group, a publicly traded multinational media conglomerate operating across North America and Europe, uses a custom content management system (CMS) to store and distribute licensed broadcast footage worth hundreds of millions of dollars. The CMS maintains a change log for content uploads and deletions, but the log rotation policy purges records after 30 days to manage storage costs. During a quarterly software security assessment, the security architecture team discovers that a series of unauthorized bulk exports of licensed footage occurred 45 days ago — outside the retention window. GDPR obligations and licensing agreements with content partners require the company to demonstrate accountability for data handling over a minimum 90-day lookback period. The CFO is resisting a storage budget increase, citing cost pressures. Which recommendation should the CISO present to the board to best address both the software security control gap and the regulatory accountability requirement, while acknowledging the CFO's budget constraint?

    • A. Negotiate retroactive log reconstruction with the CMS vendor by recovering deleted log files from backup tapes, and defer the retention policy change until the next fiscal year budget cycle.
    • B. Immediately extend the CMS change-log retention period to 90 days using compressed, tiered storage to minimize cost impact, and establish a risk-accepted exception for the current 45-day gap documented with executive sign-off.
    • C. Replace the custom CMS with a commercially available digital asset management platform that includes built-in 90-day audit trails, funded through the existing software refresh budget.
    • D. Outsource all content distribution to a licensed third-party CDN provider whose contractual SLA includes audit log retention, transferring accountability to the vendor.
    View answer & explanation

    Correct answer: B. Immediately extend the CMS change-log retention period to 90 days using compressed, tiered storage to minimize cost impact, and establish a risk-accepted exception for the current 45-day gap documented with executive sign-off.

    [Domain 8 - Software Development Security, Task 8.3 - Assess the effectiveness of software security, Area 1 - Auditing and logging of changes] Core Concept: Assess the effectiveness of software security requires applying auditing and logging of changes in the context of the scenario, consistent with the official (ISC)² CISSP exam outline. Correct Answer (B): Immediately extend the CMS change-log retention period to 90 days using compressed, tiered storage to minimize cost impact, and establish a risk-accepted exception for the current 45-day gap documented with executive sign-off. Why the other options are incorrect: Option A: Attempting retroactive log reconstruction from backup tapes is speculative and may not be technically feasible; deferring the retention policy change to the next budget cycle leaves the organization non-compliant for an additional period and does not address the ongoing control gap. Option C: Replacing the CMS with a commercial platform is a long-term architectural decision that cannot be executed quickly enough to address the immediate compliance gap, and it introduces significant implementation risk, cost, and business disruption disproportionate to the identified deficiency. Option D: Outsourcing distribution to a CDN transfers operational responsibility but does not eliminate the organization's regulatory accountability under GDPR for data it controls; contractual SLAs with a vendor do not substitute for the organization's own demonstrable audit trail obligations.

  3. Sample question 3 · Software Development Security (10%)

    Orindax Health Systems, a large U.S. hospital network operating under HIPAA, is executing a phased lift-and-shift migration of its electronic health record (EHR) application to a public cloud IaaS environment. The security architecture team has implemented a centralized cloud-native SIEM to aggregate application change logs. During a pre-production security assessment, the assessment team discovers that the EHR application's change-logging module emits events asynchronously with a configurable buffer flush interval currently set to 900 seconds. During a simulated ransomware scenario in the staging environment, the team observes that 14 minutes of file-modification events are lost when the application container is forcibly terminated before the buffer flushes. The go-live date is two weeks away, and the vendor states that reducing the flush interval below 60 seconds will degrade application throughput by approximately 18%. As the CISO accountable for both HIPAA audit-log integrity and the go-live timeline, which risk mitigation approach BEST balances the logging control requirement against the performance constraint?

    • A. Accept the 900-second flush interval as a residual risk, document it in the risk register, and proceed with go-live on schedule since the scenario only manifests during abnormal termination events.
    • B. Mandate a flush interval of 60 seconds and absorb the 18% throughput degradation, treating audit-log completeness as a non-negotiable HIPAA control with no acceptable performance trade-off.
    • C. Configure the flush interval to 60 seconds, implement a write-ahead log or persistent message queue between the application and the SIEM to capture in-flight events on container failure, and retest throughput impact before go-live.
    • D. Delay go-live indefinitely until the vendor releases a patch that eliminates the buffer flush architecture entirely and replaces it with synchronous log writes.
    View answer & explanation

    Correct answer: C. Configure the flush interval to 60 seconds, implement a write-ahead log or persistent message queue between the application and the SIEM to capture in-flight events on container failure, and retest throughput impact before go-live.

    [Domain 8 - Software Development Security, Task 8.3 - Assess the effectiveness of software security, Area 1 - Auditing and logging of changes] Core Concept: Assess the effectiveness of software security requires applying auditing and logging of changes in the context of the scenario, consistent with the official (ISC)² CISSP exam outline. Correct Answer (C): Configure the flush interval to 60 seconds, implement a write-ahead log or persistent message queue between the application and the SIEM to capture in-flight events on container failure, and retest throughput impact before go-live. Why the other options are incorrect: Option A: Accepting a 900-second (15-minute) audit log gap as residual risk is not defensible under HIPAA's audit control standard (§164.312(b)), particularly for an EHR system; abnormal termination events are foreseeable in cloud container environments and must be accounted for in the control design. Option B: While audit-log integrity is a hard requirement, mandating the 60-second flush interval alone does not resolve the in-flight event loss problem on container failure — events buffered in memory between flushes remain at risk — making this option incomplete as a control. Option D: Delaying go-live indefinitely for a vendor patch that may not be on the roadmap is disproportionate when compensating architectural controls can close the gap within the existing timeline; indefinite delay also creates its own business and patient-care risk.

  4. Sample question 4 · Software Development Security (10%)

    Meridian Arts Collective, a nonprofit arts organization with 60 staff members across three regional offices, operates a grant application portal built on an open-source framework. The organization has no dedicated security staff; a part-time IT contractor manages infrastructure. Following a tip from a peer organization, the executive director learns that a similar open-source portal was exploited in another nonprofit sector breach, where attackers modified application code in production to harvest applicant personal data over six weeks before detection. Meridian's IT contractor confirms that the portal has no file integrity monitoring and that application code changes in production are not logged separately from web server access logs. The board has asked the CISO-equivalent (the IT contractor acting in that capacity) to assess whether Meridian's portal would have detected a similar attack. As the IT contractor serving in a CISO-equivalent capacity for Meridian Arts Collective, which recommendation BEST addresses the identified gap in assessing the effectiveness of the portal's software security controls against the described threat?

    • A. Migrate the grant application portal to a commercial SaaS platform immediately, as open-source frameworks are inherently less secure than vendor-managed solutions and cannot be adequately protected by a part-time contractor.
    • B. Implement file integrity monitoring on production application files and establish a dedicated, tamper-evident change log for code and configuration modifications, then baseline current file states to enable detection of unauthorized alterations.
    • C. Increase the frequency of manual code reviews by the IT contractor from quarterly to monthly, and require the executive director to approve all code changes before deployment to production.
    • D. Block all external access to the grant portal until a full third-party penetration test is completed, as the organization cannot assess its own security posture without independent validation.
    View answer & explanation

    Correct answer: B. Implement file integrity monitoring on production application files and establish a dedicated, tamper-evident change log for code and configuration modifications, then baseline current file states to enable detection of unauthorized alterations.

    [Domain 8 - Software Development Security, Task 8.3 - Assess the effectiveness of software security, Area 1 - Auditing and logging of changes] Core Concept: Assess the effectiveness of software security requires applying auditing and logging of changes in the context of the scenario, consistent with the official (ISC)² CISSP exam outline. Correct Answer (B): Implement file integrity monitoring on production application files and establish a dedicated, tamper-evident change log for code and configuration modifications, then baseline current file states to enable detection of unauthorized alterations. Why the other options are incorrect: Option A: Migrating to a commercial SaaS platform may be a long-term strategic option, but it does not address the immediate assessment need and is not inherently more secure — SaaS platforms also require proper configuration and monitoring. The recommendation conflates platform choice with security control effectiveness. Option C: Increasing manual code review frequency is a useful supplementary control but is insufficient as a primary detective mechanism for production code tampering. Manual reviews are periodic and resource-intensive, and they do not provide the continuous monitoring needed to detect the six-week-duration attack described in the scenario. Option D: Blocking all external access to the portal is a disproportionate response that disrupts the organization's mission-critical grant application function. A penetration test validates attack surface exposure but does not establish the ongoing change-detection capability needed to assess software security effectiveness over time.

  5. Sample question 5 · Software Development Security (10%)

    Veridian Pharmaceuticals, a mid-sized U.S.-based drug manufacturer subject to FDA 21 CFR Part 11 and HIPAA, recently deployed a new clinical trial data management system (CTDMS) that encrypts patient records at rest using AES-256. During a routine internal security assessment, the CISO discovers that the CTDMS audit log subsystem records successful encryption key rotations but silently suppresses log entries whenever a key rotation fails due to a hardware security module (HSM) timeout. Three weeks after go-live, a failed key rotation went undetected for 11 days, leaving a subset of trial records encrypted under an expired key. Regulatory inspectors are scheduled to arrive in 72 hours. The CISO must determine the most effective immediate action to demonstrate control effectiveness and limit regulatory exposure. Given the audit log gap that masked the failed key rotation for 11 days and the imminent regulatory inspection, which action should the CISO prioritize FIRST to most effectively address both the control failure and the regulatory risk?

    • A. Immediately patch the CTDMS audit log subsystem to capture failed key rotation events, then generate a corrective action report documenting the gap, its duration, and the remediation steps taken before the inspection.
    • B. Notify the FDA of the audit log deficiency in writing before the inspection begins, citing voluntary disclosure as a mitigating factor under 21 CFR Part 11 enforcement discretion.
    • C. Perform an emergency re-encryption of all affected records under a valid current key and mark the incident as resolved in the change management system prior to the inspection.
    • D. Suspend CTDMS operations until a full forensic review of all key rotation events since go-live is completed, preventing inspectors from accessing potentially non-compliant data.
    View answer & explanation

    Correct answer: A. Immediately patch the CTDMS audit log subsystem to capture failed key rotation events, then generate a corrective action report documenting the gap, its duration, and the remediation steps taken before the inspection.

    [Domain 8 - Software Development Security, Task 8.3 - Assess the effectiveness of software security, Area 1 - Auditing and logging of changes] Core Concept: Assess the effectiveness of software security requires applying auditing and logging of changes in the context of the scenario, consistent with the official (ISC)² CISSP exam outline. Correct Answer (A): Immediately patch the CTDMS audit log subsystem to capture failed key rotation events, then generate a corrective action report documenting the gap, its duration, and the remediation steps taken before the inspection. Why the other options are incorrect: Option B: Voluntary disclosure to the FDA before the inspection may ultimately be appropriate, but it does not fix the underlying audit log defect or protect the integrity of the records; notifying regulators of an unresolved control failure without accompanying remediation evidence typically increases, not decreases, enforcement risk. Option C: Re-encrypting affected records addresses data integrity but does not remediate the audit log gap that caused the 11-day blind spot; inspectors will still find a logging control that fails silently, and performing remediation without documented change control could itself raise compliance concerns. Option D: Suspending CTDMS operations halts ongoing clinical trial data collection, creating significant business and patient-safety impact disproportionate to the risk, and does not resolve the audit log deficiency; inspectors would likely view an operational suspension without a clear remediation plan as an escalation of the problem rather than a mitigation.

CISSP exam prep FAQ

What is the passing score for the CISSP exam?
The CISSP exam uses a scaled score. A common published passing threshold is 700 out of 1,000 points (minimum 25% in each domain). Always confirm the current requirement on the official (ISC)² exam guide before you sit for the test.
How many questions are on the CISSP certification exam?
The live CISSP exam typically includes 100–150 questions with about 3 hours on the clock. Formats can vary by delivery mode and exam update.
How do domain quizzes help with CISSP exam prep?
Domain quizzes on IT Cert Ready let you practice CISSP one blueprint domain at a time across 8 official exam domains. You get immediate feedback, detailed explanations, and can revisit weak areas before taking a full timed mock exam.
How many CISSP practice questions are on IT Cert Ready?
IT Cert Ready includes 1,677 published CISSP practice questions with domain quizzes, full-length mock exams, and answer explanations mapped to the official outline.